TrueScope BuildChoose a paid review ↗

Detailed fictional demonstration

See the quote through a clearer lens.

This worked example shows the structure and level of explanation a TrueScope report can provide. Every name, value and finding is synthetic.

Sample / demonstration onlyNot a customer report, price benchmark, savings claim, contractor verification or professional certification.
TRUESCOPE BUILD / REPORT 002184

Residential renovation quote review

Johannesburg, Gauteng · Fictional homeowner · Fictional contractor

Quote date
08 Aug 2026
Quoted total
R895 000 incl. VAT
Documents
Quote + 2 drawings
Package shown
Smart Quote Breakdown
78/ 100
Quote clarityWATCHUsable as a basis for discussion, but key commercial and scope questions remain.

Decision summary

Do not accept unchanged.

The total reconciles and much of the work is described, but the deposit, allowances and several completion details should be clarified in writing before signature.

02Higher-risk findingsResolve before signing
05Items needing clarityAsk and document
06Checks that look clearOn supplied documents
07Contractor questionsReady to copy and send

Quoted composition

Where the R895 000 sits.

This visual shows the quote’s stated allocation. It does not represent a market benchmark.

Building work 42%Finishes 25%Services 19%Other 14%
Building and structural workR375 900Defined scope, some quantity detail missing
Finishes and joineryR223 750Product ranges need confirmation
Electrical and plumbingR170 050R142 000 is provisional
Preliminaries and otherR125 300Waste and final clean unclear
Quoted total incl. VATR895 000Arithmetic reconciles

What deserves attention

Findings with reasons and questions.

Each flag separates the observation from its possible impact and the question to send back.

01Higher risk

Deposit is not tied to defined mobilisation work

The quote requests 35% before work starts but does not state what is purchased, delivered or secured by that payment.

Why it matters
R313 250 requested before a measurable milestone
Ask the contractor
Please break the deposit into materials, mobilisation and other costs, with evidence of what becomes ours on payment.
02Higher risk

Electrical and plumbing scope is described as provisional

The allowance does not state quantities, fitting ranges, points or the basis used to calculate the amount.

Why it matters
R142 000 remains exposed to later adjustment
Ask the contractor
Please provide the assumed number and type of points, fixtures and fittings behind both allowances.
03Needs clarity

Painting preparation is not defined

The quote includes final paint coats but does not confirm crack repair, sanding, primer or protection of existing finishes.

Why it matters
Potential variation or finish-quality dispute
Ask the contractor
Please confirm the complete preparation system and the number and brand range of coats included.
04Needs clarity

Waste removal frequency is unclear

Removal is included, but the number of loads, disposal fees and final builders clean are not specified.

Why it matters
Unclear responsibility and possible additional charges
Ask the contractor
Please state the number of removal loads, whether disposal fees are included, and whether a final clean is included.
05Looks clear

VAT and arithmetic reconcile

The subtotal, VAT and stated contract total reconcile within the supplied quote.

Why it matters
No arithmetic exception identified
Ask the contractor
No question required on the supplied arithmetic.

Cash-flow exposure

The proposed payment path.

The deposit is the main commercial concern because it precedes a defined measurable milestone.

0135%DepositR313 250 · before start
0225%Structural milestoneR223 750
0325%Services & finishesR223 750
0415%Practical completionR134 250
Primary payment question

What materials, mobilisation activity or other measurable value does the deposit secure, and what evidence will be provided before it is paid?

Contractor clarification sheet

Seven questions, ready to use.

Ask for the answers in writing and attach them to the final accepted scope.

  1. 01

    What exact work, materials and ownership are secured by the 35% deposit?

  2. 02

    Which drawings, specification revision and finish schedule form part of the price?

  3. 03

    What quantities and product assumptions support the electrical and plumbing allowances?

  4. 04

    Which items are expressly excluded from the quoted total?

  5. 05

    How will variations be priced, approved in writing and added to the programme?

  6. 06

    What evidence confirms completion before each milestone payment becomes due?

  7. 07

    Are compliance certificates, testing, commissioning and final cleaning included?

Before acceptance

A practical decision sequence.

1Send the questions

Request written answers and a revised quote or addendum.

2Reconcile the scope

Make sure drawings, specifications, allowances and exclusions agree.

3Reset payment triggers

Tie payments to defined evidence and completed work.

4Use the right professional

Refer structural, regulated, legal or specialist matters where appropriate.

Confidence and limitations

This fictional sample illustrates report structure only. A real review depends on readable, complete supplied documents. TrueScope does not inspect the site, verify workmanship or replace an architect, engineer, quantity surveyor, attorney or other registered professional.

Upload my quote for review →

Your quote deserves its own review

Turn the document into clear questions.

This sample shows the experience. A paid review applies the relevant checks to the quote or quotes you actually supply.

Choose my paid review →